|
CFA PREBORING
Soil improvement works:
• High pressure jet grouting (JGP)
• High pressure jet mechanical mixing (JMM)
• Deep soil mixing (DSM)
• Bored pile base grouting
• Tube a manchetta (TAM) grouting
• Wet speed mixing (WSM)
• Rock grouting
• Chemical grouting
• Cavity grouting
• Curtain grouting
|